TECHMATIC News
The 9t/hr lime slaking plant at AngloGold Noligwa has been comissioned having run at full production on the 25th July 2012. The plant was handed over end of July 2012. The plant with three 300m³ silos is designed to withstand seismic loading of This meant that the silos were designed with a large diameter and low height with a large ...